To install the shed, I first prepared a place for it. I removed the paving stones, leveled the stones along the contour and in the middle. I mounted a frame made of timber on the stones, and laid playwood on the timber. When the floor for the shed was ready, I laid paving stones around it, which had to be cut in many places. After that, I assembled the shed on the finished foundation. All work was carried out according to the instructions attached to the shed.


